Owner needs a warm/cold aircon system installed in the master bedroom for this winter, so organized it to be done today..reported back to MacAnthony Realty
Archive for November, 2007
The building of a 3 bedroom house extension has been completed in a villa at Mijas golf. This was a two months work including all concrete, building, plastering, rendering work, plumbing, electrical and a/c installation. The extension has three bedrooms, two full bathrooms both with walking showers done in mosaic marble tiles and there is a wooden floor through out the all house.
Six industrial clean in new developments has been done this week along the Costa del Sol.
Two Daikin Inverter split Air Conditioning machines has been installed in Marbella.
We have just finished with the installation of a split air conditioning machines Fujitsu Inverter in Residence Don Juan, Carvajal.
Two industrial cleans has been done in two Developments in Mojacar and Vera, Costa Almeria. Shower screens are due to be installed this week once the furniture installation is completed.
Yesterday we have completed the extension of an aprtment and conversion of 1 bedroom to a 2 bedroom apartment in Almerimar, Costa Almeria.
Two industrial cleans have been done in Vera and Mojacar, Costa Almeria.
Lock change and industrial clean has been completed in apartment in Vera, Costa Almeria.